Question
What is jit activation?

Answers

The objective of JIT activation is to minimize the amount of time for which an object lives and consumes resources on the server.
With JIT activation, the client can hold a reference to an object on the server for a long time, but the server creates the object only when the client calls a method on the object. 
After the method call is completed, the object is freed and its memory is reclaimed. JIT activation enables applications to scale up as the number of users increases.   Your Comment




More Software Questions..
What is the inputsplit in map reduce software?

What is software configuration management?

What Is Java Api For Xml-based Rpc (jax-rpc)?

How can you implement fine-grained auditing?

What is IBM’s simple explanation for Big Data’s four critical features?

What is static synchronized method in JDBC API? Give an example?

What does the NULLIF function do?

What happens if a start method is not invoked and the run method is directly invoked?

Should we override finalize method

what is the difference between mysql_fetch_array and mysql_fetch_object?

How will XML affect my document links?

Why to use Style Sheets?

What are Filters in MVC?

Can you explain Application layer in OSI model?

How to define new testplan attributes?

What are the minimum system requirements to run Photoshop? Is it possible to run Photoshop over linux?

Which oracle package is used to manage the oracle lock management services?

What is Latch Up? Explain Latch Up with cross section of a CMOS Inverter. How do you avoid Latch Up?

What is marker interface?

What types of partitioning are there for BW?



Search
Can you Answer!!
  • Q The period which a person has to reside in India before he or she qualifies to acquire citizenship by registration?
  • Q Name the fruit of Huaceae Family ?
  • Q How do the blocker processes exist internally in sybase?
  • Q What is a paratope?
  • Q What's SLR?
  • Q Which is the biggest gulf of the world-
  • Q What is the difference between proxied and proxyless calls in ajax?
  • Q Which is the smallest butterfly of India ?
  • Q Do you have any questions for CIGNA management?
  • Q How is the SUBSTR keyword used in sql?
  • Q "maintenance order-teco" i have created a purchase requisition through a maintenance order by using non-stock item category. Later, i decided that i don't want that material for that work. So i ticked on clear reservation at the time of confirmation in iw42. When i tried to tech the maintenance order, i am getting the following error message: "final issue for the reservation item 0001 is not completed, teco not possible message no. Me303" question:how can i do tech without the need of that material? i won't create a po normally if i do clear reservation at the time of confirmation. Automatically, the system will delete the pr. It's happening in ides. It didn't happen in production server (ecc 5.0) though. How can i do tech without the need of that material?