Question
What is the name given to ratio of actual cycle efficiency and ideal cycle efficiency?

Answers

Efficiency ratio.   Your Comment




More Engineering,mechanical engineering Questions..
Tell us two plus points and two negative points about Unix.

How do you determine Specific gravity of cement?

What is the function of EGR value?

Explain the difference between rotational and irrotational flow?

what is unit power of a Turbine ?

Explain how to uninstall the libraries in Linux?

What is the unit for reluctance?

What is dhcp scope?

How do you compute the complexities of various algorithms?

What is the advantage of open source?

Define What is the tensile strength of wood?

How much water is lost through a commercial cooling tower system with a throughput of about 600 gpm?

What are the different lift augmentation devices present?

What is the withdrawal force of steel nails?

What is the average density of soil?

How can one estimate how the friction factor changes in heat exchanger tubes with a change in temperature?

What are the types of computer based social engineering attacks? explain what is phishing?

Brick strength is more or concrete block?

What is the meaning of Flaring?

What are the points in the stress strain curve for steel?



Search
Can you Answer!!
  • Q What is ODBC and JDBC? How do you connect the database?
  • Q Define an abstract data type (adt)?
  • Q what is the full form of HTTP?
  • Q What are the 3 different types of point or gene mutations?
  • Q India and which country recently held talks on ways to enhance bilateral economic ties and a Comprehensive Economic Partnership Agreement (CEPA) between the two countries which is in the final stage of negotiations?
  • Q What is the use of dct?
  • Q What is the disadvantage of direct immuno fluorescence?
  • Q An IS auditor conducting a review of disaster recovery planning at a financial processing organization has discovered the following: * The existing disaster recovery plan was compiled two years ago by a systems analyst in the organization's IT department using transaction flow projections from the operations department. * The plan was presented to the deputy CEO for approval and formal issue, but it is still awaiting his attention. * The plan has never been updated, tested or circulated to key management and staff, though interviews show that each would know what action to take for their area in the event of a disruptive incident. The IS auditor's report should recommend that: A. the deputy CEO be censured for his failure to approve the plan. B. a board of senior managers be set up to review the existing plan. C. the existing plan be approved and circulated to all key management and staff. D. a manager coordinate the creation of a new or revised plan within a defined time limit.
  • Q If the DAC server is down, where you can check reason of failure?
  • Q In rent control jurisdictions, an owner can raise a Tenant’s rent without any restrictions. (A)True (B)False
  • Q Explain about entity curr adj member in hfm?