Question
What is stub zone?

Answers

A stub zone is a read only copy of a zone that contains only those resource records which are necessary to identify the authoritative DNS servers for that particular zone. A stub zone is practically used to resolve names between separate DNS namespaces. This type of zone is generally created when a corporate merger or acquire and DNS servers for two separate DNS namespaces resolve names for clients in both namespaces.A stub zone contains:

The start of authority (SOA) resource record, name server (NS) resource records, and the glue A resource records for the delegated zone.
The IP address of one or more master servers that can be used to update the stub zone.   Your Comment




More Software Questions..
What is the inputsplit in map reduce software?

What is software configuration management?

What Is Java Api For Xml-based Rpc (jax-rpc)?

How can you implement fine-grained auditing?

What is IBM’s simple explanation for Big Data’s four critical features?

What is static synchronized method in JDBC API? Give an example?

What does the NULLIF function do?

What happens if a start method is not invoked and the run method is directly invoked?

Should we override finalize method

what is the difference between mysql_fetch_array and mysql_fetch_object?

How will XML affect my document links?

Why to use Style Sheets?

What are Filters in MVC?

Can you explain Application layer in OSI model?

How to define new testplan attributes?

What are the minimum system requirements to run Photoshop? Is it possible to run Photoshop over linux?

Which oracle package is used to manage the oracle lock management services?

What is Latch Up? Explain Latch Up with cross section of a CMOS Inverter. How do you avoid Latch Up?

What is marker interface?

What types of partitioning are there for BW?



Search
Can you Answer!!
  • Q Which property specifies the right margin of an element
  • Q In Italian cooking what are small dumplings made from potato, semolina, or flour?
  • Q "date used for maintenance plan scheduling using shift factor" i need some confirmation information on maintenance plan scheduling. Question:if you are using maintenance plan and makes use of shift factors, what date is used in the adjustment of the maintenance plan which is considering previous order? is it the teco date on the order or is it on the confirmations date? i have heard it is on the first confirmed operation but cannot believe this, unless it is adjusted with every sub-sequent confirmation. I do not have access to a system currently. Is there an explanation on the written principle to plan adjustments when using shift factors?
  • Q What is the function of having SimpleWebServer and “Elevated Privilegesâ€?
  • Q How to keep stock of fungi for long term ?
  • Q With which instrument can a sailor in a submarine see the objects on the surface of sea?
  • Q What are all the different DB that WinRunner can support?
  • Q Which hormones are involved in the urinary sytem of a human body?
  • Q As per 2001 census, which one is the most literate religious community in India?
  • Q Do you consider history a science?
  • Q The Mughal forces defeated a Rajput ruler at the pass of Haldighat. Which ruler are we talking about?