Question
How to use quality centre in real time project?

Answers

After completing the test cases, we do:

Export the test cases into Quality Centre.
The test cases will be loaded in the test plan module.
When execution is started. We move the test cases from test plan tab to the test lab module
In test lab, we execute the test cases and put as pass or fail or incomplete. We generate the graph in the test lab for daily report and sent to the specific user.
If we got any defects and raise the defects in the defect module. When raising the defects, attach the defects with the screen shot.   Your Comment






Search
Can you Answer!!
  • Q Madrid there are more what in one street than all of Finland
  • Q Why does the xml data generated by the domlsserializer does not match my original xml input
  • Q The members of Rajya Sabha are elected by
  • Q Discuss in detail the physical, chemical and microscopic examination of urine sample.
  • Q The rivers of Narmada, Tapti, Mahi & Sabarmati drains into which gulf?
  • Q what is repolarization
  • Q What is meant by top-down and bottom-up approaches?
  • Q Software maintainability BEST relates to which of the following software attributes? A. Resources needed to make specified modifications. B. Effort needed to use the system application. C. Relationship between software performance and the resources needed. D. Fulfillment of user needs.
  • Q How to map the requirements with test cases in quality center?
  • Q what is primary follicles
  • Q The major emphasis of Third Five Year Plan was :