Question
There are three trucks A, B, C. A loads 10 kg/min. B loads 13 1/3 kg/min. C unloads 5 kg/min. If three simultaneously works then what is the time taken to load 2.4 tones?

Answers

Work done in 1 min =10 + 403403 – 5= 553553 kg/min
For 1 kg = 3/55 min
For 2.4 tonnes = 3/55 x 2.4 x 1000 = 130 mins = 2hrs 10min.   Your Comment






Search
Can you Answer!!
  • Q On the death of Gandhiji, who said that “The light has gone out of our lives…..”?
  • Q What is the color code for reset?
  • Q What are the New Job Postings from the Company or Organization, Inter–University Consortium for DAE Facilities ?
  • Q The Bundaberg Rum stadium is located in
  • Q Which of the following OSPF commands, when used together, will put the network 192.168.10.0/24 into OSPF area 0? (Select all valid responses) A. Router(config-router)# network 192.168.10.0 0.0.0.255 0 B. Router(config-router)# network 192.168.10.0 0.0.0.255 area 0 C. Router(config-router)# network 192.168.10.0 255.255.255.0 area 0 D. Router(config)# router ospf 0 E. Router(config)# router ospf 1
  • Q Which Asian country’s national anthem is ‘Nokor Reach’ ?
  • Q What is the use of treturn and texit statements in the test script?
  • Q What is soa governance? what are its functions?
  • Q What are the ADO.NET connection pooling parameters?
  • Q What type of animal is Bullseye in the Toy Story films?
  • Q The page footer is defined using the statement