- Q When oracle allocates an sga?
- Q Sariska and Ranthambore are famous for which animal?
- Q Which pop group had a hit with Silence is Golden
- Q What is Twice Compilation is ASP.NET ?
- Q "maintenance order-teco" i have created a purchase requisition through a maintenance order by using non-stock item category. Later, i decided that i don't want that material for that work. So i ticked on clear reservation at the time of confirmation in iw42. When i tried to tech the maintenance order, i am getting the following error message: "final issue for the reservation item 0001 is not completed, teco not possible message no. Me303" question:how can i do tech without the need of that material? i won't create a po normally if i do clear reservation at the time of confirmation. Automatically, the system will delete the pr. It's happening in ides. It didn't happen in production server (ecc 5.0) though. How can i do tech without the need of that material?
- Q What is the use of automatic impedance hematology instrument?
- Q What are the risks associated with NET Banking?
- Q Which two numbers are used in binary code?
- Q What is the mission of your life
- Q Who has been appointed as the new Lieutenant Governor of Delhi?
- Q Which filter has the highest Q factor?